IM306: How to implement IM306 in HW-Config and how to use GSD-files "Zeige 115U Steckplaetze" and "Zeige 135U Prozessabbild"
Following steps are necessary to configure IM306
in a S7 project:
- Choose slave from GSD files, enter PB address
and connect it with the PB master.
- The existing modules in the S5 rack have to be
chosen from GSD files.
Add them to the slave configuration OR usefunction ShowRackProcessimage“/„Show135UProcessimage“/„Show115USlotaddresses“
without any other GSD files in the rack to display the plugged modules in a
“VAT”.
- Example: „VAT“ monitoring the modules’ addresses 135U
- Example: „VAT“ monitoring the modules’ addresses 115U above HW1, FW1.09
- Addressing S5 modules in HW-Config
Back to category General questions